Statistics:

Length:
71 km
Termini:
Northern: Southern Expressway (M2) and Main South Road (A2), Bedford Park
Southern: Victoria Street (B37 and unnumbered) and Wills Street, Victor Harbor
Suburbs, Towns & Localities Along Route:
Bedford Park, Darlington, O'Halloran Hill, Fountain Valley, Reynella, Morphett Vale, Huntfield Heights, Old Noarlunga, McLaren Vale, Tatachilla, Willunga, Mount Compass, Mount Jagged, Hindmarsh Valley, Hayborough and Victor Harbor

Route Numbering:

Current: A13
Multiplexed with: B34 B37
Road Authority Internal Classification: 1
04760 (Victor Harbor to Old Noarlunga)
06203 (Old Noarlunga to Bedford Park)

General Information:

A13 is one of the main north-south routes in metropolitan Adelaide and links the city to the Fleurieu Peninsula, the route starts in Bedford Park and continues through Morphett Vale, Reynella and Old Noarlunga. From Old Noarlunga, Main South Road continues south as the B23, while the A13 follows Victor Harbor Road to the small town of Mount Compass then south onto the holiday destination of Victor Harbor. 2

Multiplexes along the route include:
B34, for 1.6 km, between Willunga and Willinga Hill.
B37, for 3 km, between Hayborough and Victor Harbor

History:

1998: A13 route number given when Transport SA was rolling out route numbers with the introduction of the alphanumeric numbering system.
2004: upgrade of the Main South Road, Beach Road and Doctors Road Intersection at Hackam West.
May 2010: Intersection upgrade works at the corner of Victor Harbor Road and Main South Road commenced. 3
September 2010: Completion of intersection upgrade at Victor Harbor Rd and Main South Rd. Works included installation of traffic lights including a pedestrian crossing at the Main South Road junction with Victor Harbor Road widening South Road to three lanes each way between Main South Road and Seaford Road / Patapinda Road, introduction of additional lanes on the Victor Harbor Road and the Main South Road (south) approaches and improving the existing Main South Road / Seaford Road / Patapinda Road intersection. 3
October 2011: Work commences on grade separation of the junction of Main South Road and Main Road at McLaren Vale. 4
January 2013: Grade separation works at Main South Road and Main Road, McLaren Vale, completed. 4
2014: Construction begins on a point-to-point speed camera on a 5.7 kilometre stretch of Victor Harbor Road from McLaren Vale to Willunga. 5
April 2014: Work starts on the construction of a sheltered left turn lane on Victor Harbor Road into Hindmarsh Tiers Road. 6
October 2015: Safety upgrades implemented between Old Noarlunga and Victor Harbor. Work included 1.2 metre wide central painted median along a 3 kilometre section of the Noarlunga to Victor Harbor Road, between Old Willunga Hill Road and Yundi Road. Audio-tactile line marking was also installed as part of the central median, to help prevent the risk of head on road crashes. The work also included extending the sheltered right turn lane at the junction with Pages Flat Road, resurfacing works and the replacement safety barriers. 7
2017: A13 replaced by M2, A2 and A9 between Elizabeth and Bedford Park. 8
November 2017: Installation of first Southern Expressway bridge, forming part of interchange with Main South Rd at Bedford Park. 9
August 2018: Installation of second Southern Expressway bridge, forming part of interchange with Main South Rd at Bedford Park. 10

Click or tap here for the former alignment between Elizabeth and Bedford Park

1 SA Government, Location SA Map Viewer.
2 Tristan Anderson.
3 SA Government, Department of Planning, Transport and Infrastructure, News, Victor Harbor Road / Main South Road Junction.
4 SA Government, Department of Planning, Transport and Infrastructure, Road Projects, McLaren Vale Overpass.
5 SA Government, Department of Planning, Transport and Infrastructure, News, New cameras prove their point, 26 Sep 2014.
6 SA Government, Department of Planning, Transport and Infrastructure, News, Safety upgrade at Victor Harbour Rd intersection, 20 Jan 2014.
7 SA Government, Department of Planning, Transport and Infrastructure, News, Works begins on Noarlunga to Victor Harbor Road.
8 Darrin Smith.
9 SA Government, Department of Planning, Transport and Infrastructure, Projects, North South Corridor, Darlington Upgrade Project, 1st Major bridge move: Main South Road and Southern Expressway November 2017.
10 SA Government, Department of Planning, Transport and Infrastructure, Projects, North South Corridor, Darlington Upgrade Project, 2nd Major bridge installation - Main South Road and Southern Expressway, August 2018.