Statistics:

Wollogorang Road and Carpentaria Highway:
Length:
662 km
Termini:
Eastern: NT-QLD Border, Wollogorang
Western: Stuart Hwy (A1 and A87), Daly Waters
Miscellaneous:
Continues as Doomagee-Westmoreland Road (NR1) in Queensland
Suburbs, Towns & Localities Along Route:
Daly Waters, Birdum, Arnold, Pamayu, Borroloola, McArthur, Calvert and Wollogorang
Stuart Highway:
Length:
589 km
Termini:
Northern: McMinn Street (unnumbered) and Daly Street (unnumbered), Darwin
Southern: Carpentaria Highway (A1) and Stuart Highway (A87), Daly Waters
Miscellaneous:
Continues as Stuart Highway (A87) from Daly Waters to the NT-SA border
Suburbs, Towns & Localities Along Route:
Darwin, Palmerston, Humpty Doo, Noonamah, Adelaide River, Hayes Creek Roadhouse, Emerald Springs Roadhouse, Pine Creek, Katherine, Mataranka, Larrimah and Daly Waters
Victoria Highway:
Length:
469 km
Termini:
Eastern: Stuart Highway (A1), Katherine
Western: NT-WA Border, Baines
Miscellaneous:
Continues as Victoria Highway (NH1) in Western Australia
Suburbs, Towns & Localities Along Route:
Katherine, Victoria River Roadhouse, Timber Creek and Baines

Route Numbering:

Current: A1 B1
Former: 1 1

General Information:

The A1 / B1 route in the Northern Territory is quite unique, as it consists of three distinct sections. The central part of the route, known as the Stuart Highway, serves as a crucial north-south artery through the northern half of the Northern Territory, linking two east-west routes that carry the A1 and B1 designations.

To the west of this central section lies the Victoria Highway, which serves as a vital link between the Northern Territory and Western Australia. On the eastern side of the Stuart Highway is the Carpentaria Highway, providing a connection between the Northern Territory and northern Queensland. It's important to note, however, that while the Carpentaria Highway offers this connection, the primary route linking the Northern Territory with Queensland is the Barkly Highway (NH66), situated further south near Tennant Creek.

Carpentaria Highway:

The Carpentaria Highway, which joins the Stuart Highway just south of Daly Waters, is the main road to Borroloola. It provides access to the McArthur River Mine, and is an important road link for the pastoral industry in the Gulf and northern sections of the Barkly Tablelands.

Forming part of the massive Savannah Way which stretches across the northern parts of WA, NT and QLD, the Carpentaria Highway is an isolated route, passing through national parks and Aboriginal lands.

Stuart Highway:

The Stuart Highway is one of NT's most important routes, linking Darwin, Alice Springs and the populated areas of South Australia, including Adelaide.

Named for explorer John McDouall Stuart, the first European to cross Australia from South to North, and it generally follows his route. The Stuart Highway crosses the desert of Central Australia to savannah grasslands and tropical wetlands in the North. 4

Victoria Highway:

The Victoria Highway, of which 469 km is located in the Northern Territory, forms part of the Australian Land Transport Network and is a component of the declared Darwin to Perth Corridor. 5

History:

Carpentaria Highway:
1968: Carpentaria Highway was eventually sealed to Borroloola 1
2005: Upgrade of four bridges on the highway: October Creek, Little River, Leila Creek West and Leila Creek East. 2 Also strengthening and widening of nearly 30 km of the highway to a seven metre sealed standard, and culverts installed at the three floodways in the area commonly referred to as the Six Mile, 3 plus 18 km of gravelling on Wollogorang Road (the unsealed section of the route, east of Borroloola). 1
Stuart Highway:
1870s: The Stuart Highway began as a dirt track servicing the construction of the Overland Telegraph and served to link the railheads until World War II. 4 Construction of the telegraph line had required the development of a track along the line's route, to enable wagons and other vehicles to travel with loads of posts, wire, and other materials. An area of approximately two chains width (about 40 metres) was cleared on either side of the line and this became "the track" - the only transport route south. 6 For the whole length of "the track"e; there were frequent deviations. Detours were made to reach watering places and wet season detours were developed to avoid low and boggy ground. Tracks were continually deviated and altered by self-sufficient travellers. There was no formal development or maintenance of the road, beyond the Two and a Half Mile (Parap) in Darwin, until the late 1920s. 6
1888: The first bridge over Adelaide River at Adelaide River constructed.
1936: A low standard dry weather road was developed from Darwin to Adelaide River, roughly along the present route of the Stuart Highway. From Adelaide River a similar low standard road was developed southward to the railhead at Larrimah. However, construction and maintenance of these roads was given a very low priority because the same route was served by the North Australia Railway line. 6
May 1941: War loomed and it became apparent that the railway could not meet all defence requirements. Planners saw a need for an all weather road to service dispersed military installations, particularly airfields, in the immediate Darwin hinterland. So the Darwin Adelaide River section (115 km) was upgraded to an all weather gravel road standard. The work was done by the New South Wales Department of Main Roads. 6
1943: Early in the year, traffic between Darwin and Adelaide River had reached 2000 vehicles per day, mostly heavy lorries. The gravel surface disintegrated under this traffic and so it was decided to provide a bitumen seal - 6.2 m wide to Adelaide River and 4.8 m wide from there to Larrimah. 6
1944: Widening work was done by interstate Main Roads teams on southern section of the Stuart Highway, with the result that by 1944 the entire highway was bitumen sealed, although some sections were very narrow. 6
27 March 1980: The Edwin Verbung Bridge over Adelaide River was opened and became the primary road link over the river.
1987: Full seal (widening and upgrading) of the highway completed.
December 2004: Work commences on the $6 million project to duplicate the Stuart Highway from Noonamah to the Cox Peninsula Road. The project involved constructing two additional lanes for a distance of 6 km, creating two north-bound and two south-bound lanes. Other works included providing a formal intersection at the southern entry / exit to the Noonamah roadhouse, and a separate entry and exit at the northern approach, plus upgrades to the intersections of Elizabeth Valley Road, Keleson Road and Cox Peninsula Road. 1
2005: Construction of four additional overtaking lanes on the Stuart Highway between Darwin and Katherine. Two of the overtaking lanes are on the northbound section between Batchelor and Darwin. One just north of the Batchelor turnoff. The second just south of Acacia. The other two passing lanes are on the southbound section just north of Pine Creek and about 30 kilometres north of Katherine. 3
April 2006: Official opening of the Noonamah to Cox Peninsula Road upgrade by Infrastructure and Transport Minister Dr Chris Burns and Senator Nigel Scullion. 3
7 July 2006: Removal of traffic signals on the inbound carriageway to provide unrestricted traffic flow at the Stuart Highway / Tulagi Road intersection at Yarrawonga. The junction was altered to a signalised seagull operation. Other project works included widening the road and building a new acceleration lane. 1
16 December 2013: An integrated red light and speed camera began operation on the Stuart Highway and Jenkins Road intersection at Humpty Doo. 7
June 2014: Work began on upgrades to the intersection of the Stuart Highway and Bicentennial Road, and the intersection of the Victoria Highway and Bicentennial Road. 8
May 2016: Completion of upgrade works at Amy Johnson Avenue / Stuart Highway intersection at Winnellie. The $572 000 project included an extension to the slip lane on the Amy Johnson Avenue approach to Stuart Highway and upgrades to the existing traffic signals at the intersection. 9
July 2016: Completion of upgrade to Stuart Highway / Temple Terrace intersection including provision for access to Palmerston Regional Hospital. 10
Victoria Highway:
1970: The Victoria River Highway Bridge was opened. 5
1974: Completion of sealing of the Highway to the Western Australia border was completed. 5
2005: Work begins on upgrading Victoria Hwy between to be less susceptible to flooding. The project involved the construction of new bridges and minor realignments of the highway at Victoria River, Joe Creek, Lost Creek and Sandy Creek bridge sites, raising two sections of the highway, and construction of two passing lanes. 3
June 2014: Work began on upgrades to the intersection of the Stuart Highway and Bicentennial Road, and the intersection of the Victoria Highway and Bicentennial Road. 8
November 2016: Project to raise the height of the bridges over Saddle Creek on Victoria Highway opened to traffic. 11
July 2017: An upgrade of bridges at Big Horse and Little Horse Creeks on the Victoria Highway about 300 km west of Katherine near the township of Timber Creek. The works upgrade the roadway to a National Highway standard, improve flood immunity and access to the area and improve the road link between the Northern Territory and Western Australia. 12

Katherine to Darwin

image

Reassurance Directional Sign:

Distance sign at Adelaide River, July 2017.

Image © Michael Greenslade

image

Entering Adelaide River:

Stuart Hwy (A1) as it enters the town of Adelaide River, July 2017.

Image © Michael Greenslade

image

Advance Directional Sign:

AD sign approaching Dorat Rd (B23) at Adelaide River, July 2017.

Image © Michael Greenslade

image

Intersection Directional Sign:

ID sign at the corner of Stuart Hwy (A1) and Dorat Rd (B23) at Adelaide River, July 2017.

Image © Michael Greenslade

image

Intersection Directional Sign:

ID sign at the corner of Stuart Hwy (A1) and Dorat Rd (B23) at Adelaide River, July 2017. Note the remnant NH1 shield.

Image © Michael Greenslade

image

Adelaide River:

Old and current bridges over Adelaide River in the town of Adelaide River, July 2017.

Image © Michael Greenslade

image

Adelaide River:

Stuart Hwy (A1) as it crosses Adelaide River via Edwin Verburg Bridge in the town of Adelaide River, with the railway trestle in the distance, July 2017.

Image © Michael Greenslade

image

Reassurance Directional Sign:

Distance sign at Coomalie Creek, July 2017.

Image © Michael Greenslade

image

Advance Directional Sign:

AD sign at Livingstone approaching Cox Peninsula Road (B34), September 2008.

Image © Kate Pilling

image

Intersection Directional Sign:

ID sign at the Cox Peninsula Rd (B34) intersection in Livingstone, September 2008.

Image © Kate Pilling

image

Distance Sign:

RD sign after the Cox Peninsula Road junction at Livingstone, November 2009.

Image © Peter Renshaw

image

Distance Sign:

RD sign at Noonamah, September 2008.

Image © Kate Pilling

image

Reassurance Directional Sign:

Distance sign at Bees Creek, July 2017.

Image © Michael Greenslade

image

Advance Directional Sign:

AD sign at Yarrawonga approaching the Tiger Brennan Dr (A15) interchange, July 2017.

Image © Michael Greenslade

Darwin to Katherine

image

Parap Road:

Corner of Stuart Hwy (A1) and Parap Rd in Parap, July 2017.

Image © Michael Greenslade

image

Advance Directional Sign:

AD sign on Stuart Hwy (A1) at Winnellie approaching Billeroy Rd, July 2017.

Image © Michael Greenslade

image

Reassurance Directional Sign:

Distance sign at Berrimah, July 2017.

Image © Michael Greenslade

image

McMillans Road:

Corner of Stuart Hwy (A1) and McMillans Rd at Knuckey Lagoon, July 2017.

Image © Michael Greenslade

image

Advance Directional Sign:

AD sign at Holtze approaching Roystonea Av, July 2017.

Image © Michael Greenslade

image

Advance Directional Sign:

AD sign at Holtze approaching Roystonea Av, July 2017.

Image © Michael Greenslade

image

Supplemental Advance Directional Sign:

Supplemental AD sign at Holtze approaching Roystonea Av, July 2017.

Image © Michael Greenslade

image

Roystonea Avenue:

Stuart Hwy (A1) at the Roystonea Av interchange, Holtze, July 2017.

Image © Michael Greenslade

image

Advance Directional Sign:

AD sign at Yarrawonga, approaching Glyde Point Rd and Temple Tce, July 2017.

Image © Michael Greenslade

image

Advance Directional Sign:

AD sign at Humpty Doo, approaching Arnhem Hwy (A36), July 2017.

Image © Michael Greenslade

image

Reassurance Directional Sign:

Distance sign at Humpty Doo, July 2017.

Image © Michael Greenslade

image

Advance Directional Sign:

AD sign at Humpty Doo, approaching Jenkins Rd, July 2017.

Image © Michael Greenslade

image

Advance Directional Sign:

AD sign at Hughes, approaching Cox Peninsula Rd (B34), July 2017.

Image © Michael Greenslade

image

Reassurance Directional Sign:

Distance sign at Coomalie Creek, July 2017. Note the remnant NH1 shield.

Image © Michael Greenslade

image

Entering Adelaide River:

Stuart Hwy (A1) as it enters the town of Adelaide River, July 2017.

Image © Michael Greenslade

image

Reassurance Directional Sign:

Distance sign at Adelaide River, July 2017. Note the missing route number.

Image © Michael Greenslade

Click or tap here for the continuation of Stuart Highway as A87 between Katherine and the South Australian Border
Click or tap here for the continuation of Victoria Highway as National Highway 1 in Western Australia
1 NT Government, Department of Planning and Infrastructure.
2 NT Government, Department of Infrastructure, Transport, Regional Development and Local Government.
3 NT Government, Office of the Minister for Transport and Infrastructure.
4 NT Government, Chief Minister's Office.
5 NT Government, Natural Resources, Environment, The Arts and Sport.
6 Litchfield Shire Council.
7 Litchfield Council, Red Light and Speed Camera now in operation on the Stuart Highway and Jenkins Road intersection, 16 December 2013.
8 Australian Government, Department of Infrastructure, Regional Development and Cities, Improve Flood Immunity, Road Safety and Productivity on NT Highways - Katherine Heavy Vehicle Bypass, 22 February 2018.
9 NT Government, Department of Infrastructure, Planning and Logistics, Amy Johnson Avenue / Stuart Highway Intersection Works Complete, 23 May 2016.
10 NT Government, Department of Infrastructure, Planning and Logistics, Palmerston Road upgrades, 26 March 2018.
11 Australian Government, Department of Infrastructure, Regional Development and Cities, Kimberley connection open in time for wet season, 30 November 2016.
12 NT Government, Department of Infrastructure, Planning and Logistics, Victoria Highway - Little Horse and Big Horse Creek Crossings and Road Upgrades, 2 October 2018.