Road Photos & Information: Victoria
M3 |
|
Eastern Freeway, Eastlink & Frankston Freeway (M3) - Nunawading To Wantirna - Burwood Highway Construction |
Statistics:
- Length:
62 km (Wantirna to Noble Park: 14 km)
- Western
Terminus: Alexandra Pde (Eastern Hwy) (MR83) and Gold St,
Collingwood
- Southern
Terminus: Moorooduc Hwy (C777) and Cranbourne Rd (MR4 / TD12) at Frankston
- Suburbs, Towns
& Localities Along The Route: Nunawading,
Doncaster, Donvale,
Mitcham, Ringwood, Wantirna, Wantirna South, Glen Waverley, Noble Park,
Dandenong, Bangholme, Carrum Downs, Seaford and Frankston
Route Numbering:
- Road Authority
Internal Classification: 1996 (Eastlink)
General Information:
M3 is a motorway standard route in Melbourne's
eastern and south eastern suburbs, linking the Melbourne CBD with the
Mornington Peninsula. The Eastern Freeway is untolled, however the
Eastlink section of M3, from Nunawading to Seaford uses an electronic
distance based tolling system.
Eastlink:
Eastlink is made up of the Eastern
Freeway Extension, Ringwood Bypass and Scoresby Freeway. 1
The Eastlink section of the route
features 17 interchanges and also twin tunnels at Donvale /
Ringwood, under the Mullum Mullum valley - the Melba Tunnel and the
Mullum Mullum Tunnel. Each tunnel is 1.6km long, contain three lanes
that are 3.5m wide with a height clearance for vehicles of 4.65m. The
tunnels have a gradient of up to 5.5% and are located up to 53m from
surface level. 2
The route also features 3 traffic lanes
in each direction for 33km from the Eastern Freeway to Thompson
Road at Carrum Downs, and also has 103 structures, including 88
bridges. 3
History:
- 23 September 2002: The Bracks Government announced that it
would amalgamate the Scoresby Freeway project with the Eastern Freeway
Tunnels project. The combined project, was to be known as the
Mitcham-Frankston Freeway. 4
- October 2004; The tender for construction of the project was
awarded to ConnectEast. 1
- November 2004: Construction commences on Eastlink. 1
- 29 June 2008: Eastlink opens to traffic. 1
Burwood Highway Area:
|
Construction project Sign:
Typical Eastlink construction sign, looking southeast along Burwood Hwy (MR26) at Wantirna, May 2005.
Image © Viseth Uch
|
|
Construction of the Eastlink / Burwood Highway Interchange:
Construction site of the Eastlink / Burwood Hwy (MR26) interchange at Wantirna, May 2005.Image © Viseth Uch
|
|
Construction of the Eastlink / Burwood Highway Interchange:
Construction site of the Eastlink / Burwood Hwy (MR26) interchange at Wantirna, May 2005.Image © Viseth Uch
|
|
Construction of the Eastlink / Burwood Highway Interchange:
Construction site of the Eastlink / Burwood Hwy (MR26) interchange at Wantirna, May 2005.
Image © Viseth Uch
|
|
Approaching Mountain Highway Intersection:
Approaching
the intersection of Burwood Hwy (MR26) and Mountain Hwy (MR28) at
Wantirna, with the construction works for Eastlink in the distance,
June 2006.
Image © Viseth Uch
|
|
Mountain Highway Intersection:
Looking southeast at the intersection of Burwood Hwy (MR26) and Mountain Hwy (MR28) at
Wantirna, with the construction works for Eastlink in the distance,
June 2006.Image © Viseth Uch
|
|
Mountain Highway Intersection:
Looking southeast at the intersection of Burwood Hwy (MR26) and Mountain Hwy (MR28) at
Wantirna, with the construction works for Eastlink in the distance, August 2006
Image © Viseth Uch
|
| Mountain Highway Intersection:
Looking southeast at the intersection of Burwood Hwy (MR26) and Mountain Hwy (MR28) at
Wantirna, with the construction works for Eastlink in the distance, January 2007
Image © Viseth Uch
|
Mountain Highway Area:
|
Construction project Sign:
Typical Eastlink construction sign, looking northeast along Mountain Hwy (MR28) at Wantirna, August 2005.
Image © Viseth Uch
|
|
Eastlink Overpass Site:
The Eastlink overpass construction site on Mountain Hwy (MR28) at Wantira, August 2005.Image © Viseth Uch
|
|
Eastlink Overpass Site:
The Eastlink overpass construction site on Mountain Hwy (MR28) at Wantira, August 2005.Image © Viseth Uch
|
|
Eastlink Workzone:
Eastlink overpass construction underway at Wantirna, June 2006, looking northeast
Image © Viseth Uch
|
|
Eastlink Workzone:
Eastlink overpass construction underway at Wantirna, June 2006, looking northeast. Note the sidetrack arrangements whilst construction is happening.
Image © Viseth Uch
|
|
Bridge works:
Retaining wall construction for the bridge that will carry Eastlink over Mountain Highway at Wantirna, June 2006.
Image © Viseth Uch
|
|
Bridge works:
Retaining wall construction for the bridge that will carry Eastlink over Mountain Highway at Wantirna, August 2006
Image © Viseth Uch
|
| Mountain Highway, Wantirna:
Looking northeast along Mountain Hwy at Wantirna approaching the interchange with Eastlink, January 2007.
Image © Viseth Uch
|
| Eastlink / Mountain Highway interchange:
Looking northeast along Mountain Hwy at Wantirna at the interchange with Eastlink, now with bridge deck in place, January 2007.
Image © Viseth Uch
|
Cathies Lane Area:
|
Blind
Creek Works:
Looking northbound inside Llewellyn Park in Wantirna South near Blind Creek, August 2006.
Image © Viseth Uch
|
|
Blind
Creek Works:
Looking northbound inside Llewellyn Park in Wantirna South near Blind Creek, August 2006.Image © Viseth Uch
|
|
Blind
Creek Works:
Looking northbound inside Llewellyn Park in Wantirna South near Blind Creek, August 2006.Image © Viseth Uch
|
|
Blind
Creek Works:
Looking northbound inside Llewellyn Park in Wantirna South near Blind Creek, August 2006.Image © Viseth Uch
|
|
Blind Creek Bridge Construction:
Construction of the Eastlink bridge over Blind Creek in Wantirna South, August 2007.
Image © Viseth Uch
|
|
Blind Creek Bridge Construction:
Construction of the Eastlink bridge over Blind Creek in Wantirna South, August 2007.
Image © Viseth Uch
|
Click here for construction photos at High Street Road in
Wantirna South
Click here for construction
photos at Boronia Road (MR32)
interchange in Wantirna |
1 Maroondah
City Council,
Developing Maroondah, EastLink
2 Eastlink, Motorway
Info
3 Linking Melbourne Authority: Projects, Eastlink, Facts & Figures
4 Minister of Transport, Media Release, Park Road Bridge Over Eastern Freeway Extension Opened
to Traffic, 26 March 2002
Last updated: 14-Feb-2019 21:02
This site © Paul Rands. All rights reserved. Some portions © (copyright) by their respective and credited owners. Permission must be obtained before using any images from this site. For details, please email by clicking here.